Phone: +86-18330713028 E-mail: admin@paris-fitting.com

About Contact |

Заводская сборка/

Prefabricated high-pressure chemical pipeline fittings for power plant pressure vessels

Material specificationCarbon steel: ASTM A105/A694 F42/ 46/52/56/60/65/70/A350 LF3/A350 LF2
Stainless steel: ASTM A182 F304/ F304/ F316/F316L/F317/317L/F321/F310/347/904
Size of raw material: DIS19~100MM round bar.

TypeElbow, tee, cross, coupling, half coupling, cap, plug, bushing, union, out-let, swage nipple,

bull plug, reducer insert and hex, nipple, street elbow, boss, ect.

FinishingCarbon steel–Galvanized or black phos, phosphating. Stainless steel–Pickled.

ServiceBuyer’s drawing or designs are available.

PressureThreaded end–2000/3000/6000LBS Socket weld end–3000/6000/9000LBS Butt welding–SCH40/SCH80/SCH160/XXS

 

  • Подробнее о продукте
  • Why choose us
  • ЧАСТО ЗАДАВАЕМЫЕ ВОПРОСЫ
  • Packing & Delivery

Characteristic
Standardized production: Prefabricated pipelines are usually produced according to unified standards and specifications, ensuring consistency in pipeline size, material, and connection methods, which is beneficial for improving the installation quality and reliability of pipeline systems.
High precision: Manufacturing in a factory environment, advanced production equipment and processes can be used to ensure the processing accuracy of pipelines, reduce errors and adjustment work during on-site installation.
Strict quality control: The production process is subject to strict quality monitoring, with corresponding quality inspection measures in every link from raw material inspection to production technology, which helps to timely detect and correct quality problems, ensuring that product quality meets relevant standards and requirements.
High production efficiency: Factory production can achieve large-scale and specialized production, and can simultaneously process and manufacture multiple pipelines, greatly improving production efficiency and shortening project construction cycles.

Advantage
Shortening the construction period: As the prefabricated pipes have already completed most of the production work in the factory, only simple installation and connection are needed on site. Compared with the traditional on-site pipeline production method, it greatly reduces the on-site construction time and effectively shortens the entire project duration.
Cost reduction: On the one hand, the large-scale production of prefabricated pipelines can reduce unit costs; On the other hand, it reduces on-site construction time and labor costs, while also reducing material waste and quality problem repair costs that may arise due to limitations in on-site construction conditions.
Improving safety: The factory production environment is relatively stable, with complete safety facilities, which can better ensure the safety of workers. At the same time, it reduces the time and frequency of dangerous operations such as high-altitude work and hot work on site, and lowers the safety risks of the construction site.
Quality assurance: As mentioned earlier, prefabricated pipelines undergo strict quality control during the production process, ensuring their quality. Compared to on-site production, prefabricated pipes are less affected by factors such as weather and environment, which can better ensure the performance and service life of the pipes.

iPad-ProApplication area
Building water supply and drainage system: including domestic cold water and hot water supply systems, as well as sewage and wastewater discharge systems inside the building. The use of prefabricated pipelines can improve the installation efficiency and quality of water supply and drainage systems, ensuring the normal operation of the system.
HVAC system: Prefabricated pipes have also been widely used in air conditioning chilled water, cooling water systems, and ventilation duct systems. It can meet the requirements of the system for pipeline insulation, sealing and other performance, while improving the installation accuracy and operational efficiency of the system.
Industrial pipeline systems: Process pipeline systems in industries such as petroleum, chemical, and power have strict requirements for pipeline material, pressure rating, and corrosion resistance. Prefabricated pipelines can be customized for different industrial needs to ensure the safe and reliable operation of the pipeline system.

Installation points
On site measurement and verification: Before installing prefabricated pipelines, precise measurements must be taken at the construction site to ensure that the size and direction of the prefabricated pipelines match the actual installation position. At the same time, it is necessary to verify whether the specifications, models, and quantities of prefabricated pipelines are consistent with the design requirements.
Pipeline transportation and storage: Precast pipelines should be protected during transportation to avoid collisions and damage. After arriving at the construction site, it should be stored according to the prescribed requirements to prevent pipeline deformation, moisture, etc.
Installation sequence and method: Determine the installation sequence of prefabricated pipelines based on the design drawings and construction plan. Generally, the main pipeline is installed first, followed by the branch pipeline and ancillary equipment. When installing, pay attention to the connection method of the pipeline to ensure a firm connection and good sealing.
Quality inspection and acceptance: After the installation of prefabricated pipelines is completed, a comprehensive quality inspection and acceptance should be carried out. Check the slope, verticality, and sealing of the connection parts of the pipeline to ensure that the pipeline system meets the design and construction quality standards.

Installation precautions
Basic inspection and acceptance: Before installing prefabricated pipelines, strict inspection and acceptance of the pipeline foundation must be carried out to ensure that the flatness, elevation, and bearing capacity of the foundation meet the design requirements, in order to prevent stress concentration and deformation of the pipeline due to uneven settlement of the foundation.
Pipeline hoisting and positioning: Due to the large volume and heavy weight of prefabricated pipelines in power plants, professional hoisting equipment and correct hoisting methods need to be used during the hoisting process to ensure that the pipelines are smoothly and accurately positioned. At the same time, attention should be paid to protecting the insulation and anti-corrosion layers of the pipeline to avoid damage during lifting.
Pipeline connection and sealing: Pipeline connection is a key link in prefabricated pipeline installation, and common connection methods include welding, flange connection, etc. For welding connections, qualified welders must operate according to the welding process specifications and undergo non-destructive testing to ensure welding quality. For flange connections, attention should be paid to the selection and installation of gaskets to ensure the sealing of the connection area.
Installation of support and hanger: The function of support and hanger is to support and fix the pipeline, ensuring the stability and safety of the pipeline during operation. The installation position, spacing, and form of supports and hangers should meet the design requirements, and spring supports and hangers or sliding supports and hangers should be reasonably set according to the thermal expansion of the pipeline to absorb the thermal displacement of the pipeline.
System debugging and inspection: After the installation of prefabricated pipelines is completed, system debugging and inspection work should be carried out. This includes blowing, flushing, water pressure testing or air pressure testing of pipelines to remove debris and inspect the tightness of pipelines. At the same time, it is necessary to monitor and adjust the thermal expansion, displacement, etc. of the pipeline system to ensure that it can work normally during operation.

Why Choose Us?

  • Quality Assurance: All products are inspected to meet rigorous industry standards, including dimensional accuracy, material quality, and pressure tolerance.
  • Custom Solutions: We offer custom sizes, materials, and finishes to meet the unique needs of your application.
  • Competitive Pricing: Our direct manufacturing and streamlined supply chain enable us to offer the most competitive prices in the market.
  • Quick Turnaround Time: Our efficient production capabilities ensure short lead times, allowing us to meet urgent project timelines.
  • Comprehensive Support: Our dedicated team of experts is available to assist with product selection, technical inquiries, and post-purchase support.
    One-Stop Solution
    We have thousands of total production experience, from raw materials to finished products.
    Competitive Price
    Large scale purchase, standardized production process and efficient management make our price competitive.
    Quick Shipping
    Years of export experience enable us to control the transportation time more accurately.
    Quality Control
    The standardized production process, comprehensive management system, professional testing equipment
    Special material customization
    We support the customization of various complex materials
    Spirit: Harding working and enterprising as well as harmonious and innovative.
    Goal: Prosperity of our industry, maintaining a high standard of integrity

 

Q: Can you accept TPI?
A: Да, sure. Welcome visit our factory and come here to inspect the goods and inspect production process.

Q: Can you supply Form e, Certificate of origin?
A: Да, we can supply.

Q: Can you supply invoice and CO with chamber of commerce?
A: Да, we can supply.

Q: Can you accept L/C deferred 30, 60, 90days?
A: We can. Please negotiate with sales.

Q: Can you accept O/A payment?
A: We can. Please negotiate with sales.

Q: Can you supply the products which comply with NACE?
A: Да, we can.

Q:What product information must I provide before making a purchase?
Please provide the grade, width, thickness, and surfacetreatment requirements, as well as the quantities you require.

Q:What shipping ports are there?
We normally ship from Shanghai,Tianjin, Qingdao, and Ningbo ports

Q:What are your payment terms?
30% T/T in advance and 70% balance before shipment or based onBL copy or LC at sight.

Q:What about product pricing information?
Prices vary due to changes in raw material prices on a regular basis.

Q:Is it possible to send samples?
Of course, we offer free samples and express shipping to customers all over the world.

Q:Do you offer a service for customized products?
Да, we can produce according to your specifications and drawings.

Q:Can I pay you a visit at your factory?
Customers from all around the world are welcome to visit our factory.

Q:Can you assist me in importing steel products for the first time?
Да, we have shipping agent who will arrange the shipment with you.

Q. What is your delivery time?
Within 7 working days after receiving your balance payment.

 

Package:1. Cartons

2. Wooden case
3. Plywood case
4. As the buyer's requirements.

Delivery Details:According to the quantities and specifications of each order;

Normal delivery times is from 25 to 35 days after receiving the deposit.
We prioritize safe and secure delivery of your products. Each fitting is carefully packed in high-quality packaging materials, such as wooden boxes or pallets, to prevent any damage during transit. We offer flexible delivery options based on your location and project timeline, with estimated delivery times ranging from 1 to 4 weeks depending on order size and customization requirements.

Prev:

Следующий:

Leave a Reply

Оставьте сообщение